Project

‘Increasing the energy efficiency of the Hotel Stupnički Dvori’

The project was launched with the aim of increasing the energy efficiency of the Hotel Stupnički Dvori. It covers and co-finances the following:

  • Construction work (purchase and installation of exterior doors and windows, replacement of part of the roof, installation of roof insulation, installation of thermal insulation of parts facing unheated spaces, and work on façades )
  • Mechanical work (heating system, cooling system, heating, cooling and ventilation system optimisation by using waste heat and hydraulically balancing the system)
  • Electrical work (replacing existing light sources with more energy efficient ones, powering new mechanical equipment, new cooling devices, new boiler and new automatic mechanical equipment controls)
  • Connecting mechanical systems with a communication network and CMS
  • Replacing existing electrical equipment with new, more efficient appliances (freezers, refrigerators, washing machines, dryers, TVs and computers)

GOALS AND EXPECTED PROJECT RESULTS:

The implementation of the project should result in a saving of 50.45% of delivered energy.

TOTAL PROJECT VALUE (HRK):

2.566.586,36 kn

AMOUNT CO-FINANCED BY THE EU:

1.876.218,93 kn

PROJECT IMPLEMENTATION PERIOD:

11 March 2019 – 11 November 2019

CONTACT PERSON:

Danijel Juričević, danijel.juricevic@expertagrupa.hr